The Program of the VII International Scientific and Technical Conference “Development and Reliability Improvement of Distribution Networks” has been published

The VII International Scientific and Technical Conference “Development and Reliability Improvement of  Distribution Networks” is to be held July 13-14, 2022 in in the Congress Hall of World Trade Center Moscow, Russia.

Organizer: PJSC ROSSETI.
Co-organizer: 
“ELECTRIC POWER. Transmission and Distribution” journal.
In association with:
CIS Electric Power Council, National Research University MPEI, Melentiev Energy Systems Institute, Siberian Branch of the Russian Academy of Sciences.
Partners: 
JSC UNECO, Tavrida Electric Group of companies, Association ERA Rossii, Encore Engineering (TransEnergoSnab), Promenergo, Forenergo®, POLYPLASTIC Group, VostokEnergoService.

PROGRAM

Download .pdf

July 13, 2022

Moderator: Sergey Schumacher, leading expert of the “ELECTRIC POWER. Transmission and Distribution” journal, Honored Power Engineer of the Russian Federation

08.00-09.00 a.m.Registration of participants, welcome coffee, exhibition

Plenary part

TimeTopic of the reportSpeaker

09.00-09.05 a.m.                            
Welcome speech of the moderator
09.05-09.15 a.m.Opening of the ConferenceAndrey V. MAYOROV, Ph.D., First Deputy General Director — Chief Engineer of Rosseti, Public Joint Stock Company (PJSC ROSSETI)
09.15-09.30 a.m.Opening speechEvgeniy P. GRABCHAK
Ph.D., Deputy Minister of the Ministry of Energy of the Russian Federation
09.30-09.45 a.m.Opening speech.
The current state and development prospects of the electric grid complex in the conditions of power industry digital transformation of the Republic of Belarus
Olga F. PRUDNIKOVA, Deputy Minister of Energy of the Republic of Belarus (Minenergo)
09.45-09.55 a.m.Opening speechDmitry I. FROLOV, Ph.D., Deputy Head of the Federal Service for Ecological, Technological and Nuclear Supervision (Rostekhnadzor)
09.55-10.05 a.m.Opening speechNikolay D. ROGALEV, D. Sc., Rector of National Research University “Moscow Power Engineering Institute”
10.05-10.15 a.m.Opening speechTaras V. KUPCHIKOV, Chairman of the Executive Committee of the CIS Electric Power Council
10.15-10.30 a.m.Opening speech.
Possibilities of using Federal Law no.238 “On independent assessment of qualifications” for monitoring the training level of distribution networks employees and improving their qualifications
Arkady V. ZAMOSKOVNY,
President of the All-Russian Industry Association of Employers in the Electric Power Industry “Energy Employers’ Association of Russia” (“ERA of Russia” Association)
10.30 a.m.-12.30 p.m.Exhibition, visit of official delegation, coffee break                                        

Section 1: Strategic Issues of Electric Distribution Networks Development

TimeTopic of the reportSpeaker

12.30-12.45 p.m.                            
Improving the reliability of Rosseti Group distribution networks by increasing its observability and controllabilityAndrey V. MAYOROV, Ph.D., First Deputy General Director — Chief Engineer of Rosseti, Public Joint Stock Company (PJSC ROSSETI)
12.45-1.00 p.m.Experience in the implementation of innovative equipment in the distribution electrical networks of PJSC Rosseti Moscow RegionDmitry B. GVOZDEV, Ph.D., First Deputy General Director – Chief Engineer of Rosseti Moscow Region, PJSC
01.00-01.15 p.m.System for automatic disconnection of 6–10 kV overhead transmission lines with insulated neutral in case of a single-phase ground faultAnatoly I. KIVA, Ph.D., First Deputy General Director – Chief Engineer of Mosoblenergo JSC
01.15-01.30 p.m.Improving the reliability of distribution electric networks operation through the introduction of power storage systemsPavel V. ILYUSHIN, D. Sc., Head of the Center for Intelligent Electric Power Systems and Distributed Power, the Energy Research Institute of the Russian Academy of Sciences (ERI RAS)
01.30-01.45 p.m.Reliability assessment of modern distribution networks during operationDmitry S. KRUPENEV, Ph.D., Head of the Laboratory “Reliability of Fuel and Energy Supply” of Melentiev Energy Systems Institute of Siberian Branch of the Russian Academy of Sciences (ESI SB RAS)
01.45-02.00 p.m.Technological design of the 20 kV megapolis electrical networkMikhail Y. LVOV, D. Sc., Director for Technical Policy and Audit, Joint Stock Company “United Energy Company” (JSC “UNECO”)
02.00-02.15 p.m.Communication systems development in power distribution networksAlexander V. SHATERNIK, First Deputy Director – Chief Engineer of the Branch “Enterprise of dispatching and technological control facilities” of Grodno republican unitary enterprise of electric power industry “Grodnoenergo” (Republic of Belarus)
02.15-02.30 p.m.Burning issues of ensuring cybersecurityAndrey V. ANTONOV, Head of the Information Security Department of the Samara Distribution Grids, Branch of Rosseti Volga, PJSC
02.30-03.30 p.m.Lunch, exhibition                                                                                                  

Section 2: Increasing the efficiency of distribution electrical networks

TimeTopic of the reportSpeaker

03.30-03.45 p.m.                            
Power supply reservation for remote settlements located in hard-to-reach areas using a reverse transformation scheme and reclosersAlexey A. MISHANIN, Deputy General Director for Technical Issues – Chief Engineer of Public joint stock company of power industry and electrification of Kuban (Kubanenergo PJSC)
03.45-04.00 p.m.OMZAL-3 microprocessor-based system for identifying and localizing the place of insulation damage relative to the groundYuri A. ROGACH, Director of the RUP “Minskenergo” branch “Molodechnenskie elektricheskie seti” (Republic of Belarus)
04.00-04.15 p.m.New approaches to the electric grid complex organization based on ready-to-use mobile modular electrical installationsAndrey V. TIKHONOVETS, Deputy Chief Engineer – Chief Power Engineer of RN-Vankor, LLC
04.15-04.30 p.m.Solving the issue of electric power supply for challenging settlements with a constant increase in population and load in conditions of limited sources of financingSergey S. SHEVCHENKO, Deputy Chief Engineer for Production Activities of Public joint stock company of power industry and electrification of Kuban (Kubanenergo PJSC)
04.30-04.45 p.m.Power supply reservation of the 10 kV electrical network for socially significant facilities. Application of independent power supply sourcesKamil N. IBRAGIMOV, Head of the Technical Department, Limited Liability Company “ROSTEKELEKTROSETI”, Krasnodar
04.45-05.00 p.m.The practice of using backup power supply sources for reverse transformation to ensure uninterrupted power supply during emergency recovery workIgor N. DMITRIEV, Ph.D., Head of the Department for Technical Re-equipment and Reconstruction, Maintenance and Repair of IDGC of Urals, JSC
05.00-05.15 p.m.Automation of medium voltage networks as a key direction in the development of power gridAndrey Y. MAKAROV, Ph.D., Professor of the Department of Energy Industry and Industrial Enterprises Management Systems, Ural Federal University named after the first President of Russia B.N. Yeltsin
05.15-06.00 p.m.Summing up the results of the first day of the Conference  Conference participants

July 14, 2022

Moderator: Vladimir N. Tulsky, Ph.D., Director of MPEI Institute of Electrical Power Engineering, Head of the STC Rosseti PJSC Section “Complex Issues of Power Distribution Networks Development”, editor-in-chief of the “ELECTRIC POWER. Transmission and Distribution” journal

08.00-08.55 a.m.Welcome coffee, exhibition                                                                              

Section 3: Implementation of new technologies (experience of electric grid companies)


08.55-09.00 a.m.                            
Welcome speech of the moderator 
09.00-09.15 a.m. OnlineEnergy supply reliability evaluation of energy Internet with distribution network as the coreWei LIU, Ph.D., Senior Expert of the Power Distribution Center of the China Electric Power Research Institute
09.15-09.30 a.m. OnlineUp-to-date data on the implementation and use of a new type of lightning protection devices for overhead power lines at Tenaga National Berhad, MalaysiaNoradlina ABDULLAH, Technical Expert (Lightning Protection) TNB Research Sdn Bhd
09.30-09.45 a.m. OnlineTheft detection unit for photo-voltaic generation in smart grid networksMostafa SHAABAN, Ph.D., Associate Professor, Department of Electrical Engineering College of Engineering (UAE)
09.45-10.00 a.m.
Online
Strategic Issues of the Distribution Networks DevelopmentOdalys Maria SANCHEZ GOMEZ,
Head of the Distribution Substation Team, Isle of the Youth Electric Company (Cuba)
10.00-10.15 a.m.Ways to reduce technological consumption of electric power in 0.4–10 kV distribution networks of the “Glubokoye Electric Networks”, RUE “Vitebskenergo” BranchOleg M. APETYONOK, Director of the RUE “Vitebskenergo” Branch Glubokoye Electric Networks (Republic of Belarus)
10.15-10.30 a.m.Technologies development for energy storage systems. Practical resultsVitaly O. AKULICHEV, Deputy General Director for Digital Transformation of “Interregional Distribution Grid Company of Centre”, Public Joint-Stock Company (IDGC of Centre, PJSC)
10.30-10.45 a.m.Functional implementation of the system “Mobile solutions for maintenance and repair” of IDGC of Urals, JSCSergey A. STARKOV, Deputy Chief Engineer for Operation of IDGC of Urals, JSC
10.45-11.00 a.m.Experience of 10 kV reclosers application in the construction of a LV switchgear at the 110 kV Sosnovo-Ozerskaya substation (branch of PJSC “IDGC of Siberia” – “Buryatia Energo”)Victor N. PERELYGIN, Deputy Director for Technical Issues – Chief Engineer of the branch of Public Joint Stock Company “Interregional Distribution Grid Company of Siberia» (PJSC “IDGC of Siberia”) – “Buryatia Energo”
11.00-11.15 a.m.State assessment of the contacts and contact connections of electrical equipment and power lines using thermal indicatorsViktor E. INOZEMTSEV, Deputy Director for Technical Policy and Audit – Head of the Department for Technical Policy and Standardization of Production Processes, Joint Stock Company “United Energy Company” (JSC “UNECO”)
11.15-11.30 a.m.Replacement of 10 kV overhead lines passing through forests with 10 kV cable lines with cross-linked polyethylene insulation. Operational experience. Performance evaluationVyacheslav V. LITVINCHUK, Deputy Chief Engineer for the High-Voltage Equipment of the Branch Mogilev Electric Networks RUE Mogilevenergo (Republic of Belarus)
11.30 a.m.-12.30 p.m.Exhibition, coffee break                                                   

Section 3 (Continuation):

TimeTopic of the reportSpeaker

12.30-12.45 p.m.                            
Power electronics devices for balancing the operating modes of three-phase transmission linesMikhail G. ASTASHEV, Ph.D., Associate Professor, Head of the Converter Technology Laboratory named after K.A.Krug (Stock Company G.M.Krzhizhanovsky Power Engineering Institute)
12.45-01.00 p.m.Improving reliability and reducing emergency outages in the electrical network on the example of Pamir Energy CompanyJamshed Sh. SHOSAFEDOV, 10/0.4 kV Distribution Networks Manager, Pamir Energy, OJSC (Tajikistan)
01.00-01.15 p.m.Power grid facilities construction and modernization in cramped conditionsOleg A. KHAREBOV, head of the Department for Technical Re-equipment, Reconstruction, Maintenance and Repair of Electric Grid Facilities of IDGC of Northern Caucasus (Rosseti Northern Caucasus), PJSC
01.15-01.30 p.m.Technologies and methods for the construction of temporary and service lines in Rosseti Moscow Region, PJSCRoman V. IVANOV, Director of the 0.4–20 kV Networks Operation Department at Rosseti Moscow Region, PJSC
01.30-01.45 p.m.Innovative algorithms for building relay protection of electrical networks with a distributed architectureAlexey V. SHALATOV, Deputy Head of the Relay Protection and Emergency Automation Central Service, Department of Operational-Technological and Situational Management, Rosseti Volga, PJSC
01.45-02.00 p.m.Implementation of the software package for identifying unaccounted electric power: resultsAndrey Y. BUGORSKIY, Head of Department for services implementation and electric power metering of “Interregional Distribution Grid Company of Centre”, Public Joint-Stock Company (IDGC of Centre, PJSC)
02.00-02.15 p.m.New technologies for 6-20 and 35 kV overhead lines lightning protectionMikhail P. FEDOSKIN, Deputy Chief Engineer for Technical Development and Operation, Mordovenergo, Branch of Rosseti Volga, PJSC
02.15-02.30 p.m.Influence of disconnected arc-suppression coils (lack of capacitive currents compensation) on power supply reliability and damage of cable lines in 6-20 kV distribution network on St. Petersburg city exampleMikhail V. VASKOV, Deputy Chief Engineer for Operational, Technological and Situational Management – Head of Department of Health and Safety, Rosseti Lenenergo, PJSC
02.30-03.30 p.m.Lunch, exhibition work                                                                                                                      

Moderator: Alexander S. Pavlov, Director of Strategic Projects of the “ELECTRIC POWER. Transmission and Distribution” journal

Section 4: Work process optimization and personnel safety

TimeTopic of the reportSpeaker

03.30-03.45 p.m.                            
Work process optimization and personnel safety: application of augmented reality technologies and VR simulators for training and advanced training of electric grid companies personnelPetr I. SPIVAK, Deputy Chief Operations Engineer – Head of the Department for Technical Operation of Grids, ROSSETI Yantar
03.45-04.00 p.m.Organizational structure typification of distribution grid companies on the ROSSETI Tyumen examplePavel N. YUSHKO, Head of the Department of Human Resources Management and Organizational Design, JSC Tyumenenergo (ROSSETI Tyumen)
04.00-04.15 p.m.Live working in JSC “Grid Company”Vadim A. BELONOGOV, Head of the Department of Power Quality and Live Working, Joint Stock Company “Grid Company” (JSC “Grid Company”)
04.15-04.30 p.m.Experimental and design activities of the private educational institution of additional professional education “Center for live working” as a contribution to the development of live working method in RussiaRushan R. DAVLETSHIN, Director of the private educational institution of additional professional education “Center for live working”

Section 5: Power quality assurance and development of new services

TimeTopic of the reportSpeaker

04.30-04.45 p.m.                            
Experience of automatic voltage regulation in electrical networks: modern technologiesVyacheslav S. MATVEEV, Chief Expert of Department of Operational and Technological Management of Rosseti, Public Joint Stock Company (PJSC ROSSETI)
04.45-05.00 p.m.Challenges of ensuring power quality in case of equipment damage in 6–35 kV electrical networksOleg I. ROZHDESTVIN, Head of Grid Assets Division of the Power Engineering Department of Rosneft Oil Company, PJSC (Rosneft)
05.00-05.15 p.m.Improving reliability and power quality of “isolated” territories. The use of autonomous hybrid electrical installations based on renewable energy sources and energy storage systemsAlexander V. SADOV, Head of the Project Office, Acting Head of Digital Transformation Department of JSC “Rosseti Tyumen”
05.15-05.30 p.m.Comparison of ways to improve power quality: strengthening the network or using booster transformersSergey E. ROY, Chief Engineer of the Production Department “South Karelian Electric Networks” of the Karelian branch of PJSC “Interregional Distribution Grid Company of North-West”
05.30-05.45 p.m.Digital telephone information system for consumers due to power outageVyacheslav V. BARTSEV, Head of the Department of Dispatch and Technological Control Facilities of RES JSC (Novosibirsk)
05.45-06.00 p.m.Summing up, closing wordsConference participants

Registration and participation are free of charge for electric grid companies, engineering companies, state institutions and universities. To fulfill the registration form, please, follow the link.

For more information on participation options for equipment production companies, suppliers and contractors as well as on advertising cooperation, please, contact the editorial board of “ELECTRIC POWER. Transmission and Distribution” journal.

Organizing Committee contact details:
Alina Antipova, Head of Department of Global Communication,
“ELECTRIC POWER. Transmission and Distribution” journal